On our final day we were set up and ready to shoot our Earth scene. We had constructed the sand pit the night before only to realise that 150kg of sand was barely enough. I took action and reserved an additional 75kg of sand from Argos. We picked up the additional sand bags an hour before the shoot and it completed the look of our set. Needless to say the guys hated carrying 30kg's worth of sand each, first thing in the morning! 

We had first aid kids and eye baths on set, as we anticipated sand getting into our dancers eyes. Fortunately we had no issues with this at all. 

One thing that did go wrong was our slider rig. The connecting screw that attached the camera to the rig kept breaking off which set us back by an hour. Despite my impatient nature for the "boys and their toys" the guys actually got really amazing shots.

It was at this point I realised that (for the first time in my life) my expectations for a group project were exceeded. When reviewing the rushes I was extremely proud of Al, Callam and Jacob. None of this would have been possible without them.



Post-Shoot Thoughts: Day Two



On the second day of shooting Al decided that Callam and I were to switch roles. This meant he was the acting cinematographer whilst I took care of the production, crew and cast's needs. This change in responsibility was far more productive as I felt more in control of my role, rather than being uncertain of the shots I was capturing with the EX3. 

Throughout the shoot of the second day I was on constant watch for spilling water. I would be mopping up whenever necessary to minimise the electrocution hazard that water posed. Too make sure the dancer was comfortable I would be on constant watch for her needs - whether it was to provide her with a towel or a kettle of hot water to heat up the pool. Alongside all these responsibilities I would be logging our shots and loading the clapperboard. 

The shoot ended successfully. Cleaning up was made easier with the water vacuum we borrowed from UCA's workshop studios. In retrospect our dancer had said that she had the most fun shooting with water! Water must certainly be therapeutic as the crew also really enjoyed shooting with water. It certainly juxtaposes the high levels of stress we were faced with the day before.



Post-Shoot Thoughts: Day One







As prepared as we tried to be, nothing could have predicted Jacob's admittance into the hospital on our first morning. This meant we would have to adapt as a group and perform the roles of cinematographer whilst Jacob was gone. Al took on responsibility for lighting, camera/technical settings and directing. Callam acted as our runner, gaffer, clapper and was responsible for logging shots. I took on the responsibility of framing the cinematography and taking care of our dancer. 





Initially I thought I could step up to perform as cinematographer however the end of the day showed that the pressure was too much for me. I was very frantic about sticking to the schedule as we had to film two elements in the same day. As stressful as it was, we got all the shots we wanted for Fire and the essential shots for Air. Jacob did show up towards the end of the shoot (against doctor's orders). Whilst on set we would consult him for his opinion on lighting and framing.

What I learnt from the first day of shooting was to be versatile and to know your limits. It was after this day I realised it was best if I didn't continue as substitute cinematographer. It was surpassing my capabilities when combined with the responsibilities of producing. On the plus side, Al taught me how to use Sony EX3 in under a minute which I found pretty impressive. 


Sunday 16 March 2014

Production Schedule

Description
Time
Date
Cast/Crew
Room
Unloading Equipment
09:00-10:00
17th March 2014
Crew
Garage & KN Singh
Pick Up Equipment
09:00-10:00
17th March 2014
Crew
Equipment Hire
Clean Studio
09:00-10:00
17th March 2014
Crew
KN Singh
Set Up Studio for Fire Scene
10:00-11:30
17th March 2014
Crew
KN Singh
Brunch Break
11:30-12:00
17th March 2014
Crew
KN Singh
Dancer Arrives, hair/make up, and warms up.
12:00 – 12:45
17th March 2014
Dancer
KN Singh
Sound, Camera & Lights Test/Set Up
12:00-12:45
17th March 2014
Crew
KN Singh
Shooting for Fire
12:45-13:45
17th March 2014
Dancer & Crew
KN Singh
Break
13:45-14:00
17th March 2014
Dancer & Crew
KN Singh
Fire Choreography
14:00-15:00
17th March 2014
Dancer & Crew
KN Singh
Lunch
15:00-16:00 (Dancer)
15:00-15:30 (Crew)
17th March 2014
Dancer & Crew
KN Singh
Set Up for Air Scene (Deconstruct Fire Scene)
15:30-16:00
17th March 2014
Crew
KN Singh
Sound, Camera & Lights Test/Set Up – Dancer Warm Up
16:00-16:45
17th March 2014
Dancer & Crew
KN Singh
Shooting for Air
16:45-17:45
17th March 2014
Dancer & Crew
KN Singh
Break
17:45-18:00
17th March 2014
Dancer & Crew
KN Singh
Shooting for Air
18:00-19:00
17th March 2014
Dancer & Crew
KN Singh
Pack & Lock Up
19:00-20:00
17th March 2014
Crew
KN Singh









Description
Time
Date
Cast/Crew
Room
Prepare Studio Floor
09:00-09:15
18th March 2014
Crew
KN Singh
Tape Down Bin Bags & Lay Down Tarpaulin for Water Set
09:15-09:45
18th March 2014
Crew
KN Singh
Fill Up with Water
09:45-10:30
18th March 2014
Crew
KN Singh
Breakfast Break
10:30-11:00
18th March 2014
Crew
KN Singh
Dancer arrives, hair/make up, and warms up.
11:00-11:45
18th March 2014
Dancer & Crew
KN Singh
Sound, Camera & Lights Test/Set Up
11:00-11:45
18th March 2014
Dancer & Crew
KN Singh
Shooting for Water
11:45-12:45
18th March 2014
Dancer & Crew
KN Singh
Break
12:45-13:00
18th March 2014
Dancer & Crew
KN Singh
Shooting for Water
13:00-14:00
18th March 2014
Dancer & Crew
KN Singh
Lunch
14:00-15:00
18th March 2014
Dancer & Crew
KN Singh
Warm Up
15:00-15:45
18th March 2014
Dancer
KN Singh
Shooting for Water (Back Up)
15:45-16:45
18th March 2014
Dancer & Crew
KN Singh
Pack Up Equipment
16:45-17:15
18th March 2014
Crew
KN Singh
Remove Water
17:15 -18:15
18th March 2014
Crew
KN Singh
Lay Down Tarpaulin & Sand
18:15 – 18:45
18th March 2014
Crew
KN Singh






Description
Time
Date
Cast/Crew
Room
Set Up
09:30-10:00
19th March 2014
Crew
KN Singh
Dancer arrives, hair/make up, and warms up.
10:00-11:00
19th March 2014
Dancer
KN Singh
Sound, Camera & Lights Test/Set Up
10:00-11:00
19th March 2014
Crew
KN Singh
Shooting for Earth
11:00-12:00
19th March 2014
Dancer & Crew
KN Singh
Break
12:00-12:15
19th March 2014
Dancer & Crew
KN Singh
Shooting for Earth
12:15-13:15
19th March 2014
Dancer & Crew
KN Singh
Lunch
13:15-14:15
19th March 2014
Dancer & Crew
KN Singh
Warm Up & Set Up
14:15-14:30
19th March 2014
Dancer & Crew
KN Singh
Shooting for Earth (Back Up)
14:30-15:30
19th March 2014
Dancer & Crew
KN Singh
Pack Up Equipment
15:30-16:00
19th March 2014
Crew
KN Singh
Clean Up
15:30-17:00
19th March 2014
Crew
KN Singh
Extra Time: Back Up Air
17:00 – 20:00
19th March 2014
Crew
KN Singh