Post-Shoot Thoughts: Day Three
On our final day we were set up and ready to shoot our Earth scene. We had constructed the sand pit the night before only to realise that 150kg of sand was barely enough. I took action and reserved an additional 75kg of sand from Argos. We picked up the additional sand bags an hour before the shoot and it completed the look of our set. Needless to say the guys hated carrying 30kg's worth of sand each, first thing in the morning!
We had first aid kids and eye baths on set, as we anticipated sand getting into our dancers eyes. Fortunately we had no issues with this at all.
One thing that did go wrong was our slider rig. The connecting screw that attached the camera to the rig kept breaking off which set us back by an hour. Despite my impatient nature for the "boys and their toys" the guys actually got really amazing shots.
It was at this point I realised that (for the first time in my life) my expectations for a group project were exceeded. When reviewing the rushes I was extremely proud of Al, Callam and Jacob. None of this would have been possible without them.
Post-Shoot Thoughts: Day Two
On the second day of shooting Al decided that Callam and I were to switch roles. This meant he was the acting cinematographer whilst I took care of the production, crew and cast's needs. This change in responsibility was far more productive as I felt more in control of my role, rather than being uncertain of the shots I was capturing with the EX3.
Throughout the shoot of the second day I was on constant watch for spilling water. I would be mopping up whenever necessary to minimise the electrocution hazard that water posed. Too make sure the dancer was comfortable I would be on constant watch for her needs - whether it was to provide her with a towel or a kettle of hot water to heat up the pool. Alongside all these responsibilities I would be logging our shots and loading the clapperboard.
The shoot ended successfully. Cleaning up was made easier with the water vacuum we borrowed from UCA's workshop studios. In retrospect our dancer had said that she had the most fun shooting with water! Water must certainly be therapeutic as the crew also really enjoyed shooting with water. It certainly juxtaposes the high levels of stress we were faced with the day before.
Post-Shoot Thoughts: Day One
As prepared as we tried to be, nothing could have predicted Jacob's admittance into the hospital on our first morning. This meant we would have to adapt as a group and perform the roles of cinematographer whilst Jacob was gone. Al took on responsibility for lighting, camera/technical settings and directing. Callam acted as our runner, gaffer, clapper and was responsible for logging shots. I took on the responsibility of framing the cinematography and taking care of our dancer.
What I learnt from the first day of shooting was to be versatile and to know your limits. It was after this day I realised it was best if I didn't continue as substitute cinematographer. It was surpassing my capabilities when combined with the responsibilities of producing. On the plus side, Al taught me how to use Sony EX3 in under a minute which I found pretty impressive.
Sunday, 16 March 2014
Production Schedule
Description
|
Time
|
Date
|
Cast/Crew
|
Room
|
Unloading Equipment
|
09:00-10:00
|
17th March 2014
|
Crew
|
Garage & KN Singh
|
Pick Up Equipment
|
09:00-10:00
|
17th March 2014
|
Crew
|
Equipment Hire
|
Clean Studio
|
09:00-10:00
|
17th March 2014
|
Crew
|
KN Singh
|
Set Up Studio for Fire Scene
|
10:00-11:30
|
17th March 2014
|
Crew
|
KN Singh
|
Brunch Break
|
11:30-12:00
|
17th March 2014
|
Crew
|
KN Singh
|
Dancer Arrives, hair/make
up, and warms up.
|
12:00 – 12:45
|
17th March 2014
|
Dancer
|
KN Singh
|
Sound, Camera & Lights
Test/Set Up
|
12:00-12:45
|
17th March 2014
|
Crew
|
KN Singh
|
Shooting for Fire
|
12:45-13:45
|
17th March 2014
|
Dancer & Crew
|
KN Singh
|
Break
|
13:45-14:00
|
17th March 2014
|
Dancer & Crew
|
KN Singh
|
Fire Choreography
|
14:00-15:00
|
17th March 2014
|
Dancer & Crew
|
KN Singh
|
Lunch
|
15:00-16:00 (Dancer)
15:00-15:30 (Crew)
|
17th March 2014
|
Dancer & Crew
|
KN Singh
|
Set Up for Air Scene
(Deconstruct Fire Scene)
|
15:30-16:00
|
17th March 2014
|
Crew
|
KN Singh
|
Sound, Camera & Lights
Test/Set Up – Dancer Warm Up
|
16:00-16:45
|
17th March 2014
|
Dancer & Crew
|
KN Singh
|
Shooting for Air
|
16:45-17:45
|
17th March 2014
|
Dancer & Crew
|
KN Singh
|
Break
|
17:45-18:00
|
17th March 2014
|
Dancer & Crew
|
KN Singh
|
Shooting for Air
|
18:00-19:00
|
17th March 2014
|
Dancer & Crew
|
KN Singh
|
Pack & Lock Up
|
19:00-20:00
|
17th March 2014
|
Crew
|
KN Singh
|
Description
|
Time
|
Date
|
Cast/Crew
|
Room
|
Prepare
Studio Floor
|
09:00-09:15
|
18th March 2014
|
Crew
|
KN Singh
|
Tape
Down Bin Bags & Lay Down Tarpaulin for Water Set
|
09:15-09:45
|
18th March 2014
|
Crew
|
KN Singh
|
Fill
Up with Water
|
09:45-10:30
|
18th March 2014
|
Crew
|
KN Singh
|
Breakfast
Break
|
10:30-11:00
|
18th March 2014
|
Crew
|
KN Singh
|
Dancer
arrives, hair/make up, and warms up.
|
11:00-11:45
|
18th March 2014
|
Dancer & Crew
|
KN Singh
|
Sound,
Camera & Lights Test/Set Up
|
11:00-11:45
|
18th March 2014
|
Dancer & Crew
|
KN Singh
|
Shooting
for Water
|
11:45-12:45
|
18th March 2014
|
Dancer & Crew
|
KN Singh
|
Break
|
12:45-13:00
|
18th March 2014
|
Dancer & Crew
|
KN Singh
|
Shooting
for Water
|
13:00-14:00
|
18th March 2014
|
Dancer & Crew
|
KN Singh
|
Lunch
|
14:00-15:00
|
18th March 2014
|
Dancer & Crew
|
KN Singh
|
Warm
Up
|
15:00-15:45
|
18th March 2014
|
Dancer
|
KN Singh
|
Shooting
for Water (Back Up)
|
15:45-16:45
|
18th March 2014
|
Dancer & Crew
|
KN Singh
|
Pack
Up Equipment
|
16:45-17:15
|
18th March 2014
|
Crew
|
KN Singh
|
Remove
Water
|
17:15 -18:15
|
18th March 2014
|
Crew
|
KN Singh
|
Lay
Down Tarpaulin & Sand
|
18:15 – 18:45
|
18th March 2014
|
Crew
|
KN Singh
|
Description
|
Time
|
Date
|
Cast/Crew
|
Room
|
Set
Up
|
09:30-10:00
|
19th March 2014
|
Crew
|
KN Singh
|
Dancer
arrives, hair/make up, and warms up.
|
10:00-11:00
|
19th March 2014
|
Dancer
|
KN Singh
|
Sound,
Camera & Lights Test/Set Up
|
10:00-11:00
|
19th March 2014
|
Crew
|
KN Singh
|
Shooting
for Earth
|
11:00-12:00
|
19th March 2014
|
Dancer & Crew
|
KN Singh
|
Break
|
12:00-12:15
|
19th March 2014
|
Dancer & Crew
|
KN Singh
|
Shooting
for Earth
|
12:15-13:15
|
19th March 2014
|
Dancer & Crew
|
KN Singh
|
Lunch
|
13:15-14:15
|
19th March 2014
|
Dancer & Crew
|
KN Singh
|
Warm
Up & Set Up
|
14:15-14:30
|
19th March 2014
|
Dancer & Crew
|
KN Singh
|
Shooting
for Earth (Back Up)
|
14:30-15:30
|
19th March 2014
|
Dancer & Crew
|
KN Singh
|
Pack
Up Equipment
|
15:30-16:00
|
19th March 2014
|
Crew
|
KN Singh
|
Clean
Up
|
15:30-17:00
|
19th March 2014
|
Crew
|
KN Singh
|
Extra Time: Back Up Air
|
17:00
– 20:00
|
19th